|
@@ -219,6 +219,10 @@ New, 12 V, open: $U_S 172 \pm 20$ V, matched $U_S 72 \pm 20$ V \textbf{NOTE, th
|
|
|
There are several measurement methods needed during the project. To verify the test pulses, voltage has to be measured over time. To verify the dummy loads, resistance has to be measured. To verify the attenuators, the magnitude response has to be measured. This chapter describes the necessary measurement theory required for this project.
|
|
There are several measurement methods needed during the project. To verify the test pulses, voltage has to be measured over time. To verify the dummy loads, resistance has to be measured. To verify the attenuators, the magnitude response has to be measured. This chapter describes the necessary measurement theory required for this project.
|